Park Maintenance

Rosebay Willowherb Jungle

The weather is warming (from time to time !!) and the rain if falling;  perfect conditions for weeds to regrow in the Park.   We are very aware of the need to get a maintenance regime in place, and are currently negotiating with Bellway to achieve this as quickly as possible.

In the meantime Pudsey Landscapes will be back week commencing 14th May,  to finish off the last jobs in the regeneration eg steps for the Greenshaw Terrace entrance,  clearing away compost, and generally tidying up.

 

Advertisements

About Jennifer Inskip Kirkby

Director and Vice Chair of Friends of Parkinson's Park CIC, Chair of Aireborough Neighbourhood Forum and Facilitator of Inskip One-Name Study. Has a degree in Local History (University of Cambridge), and Economics (University of Leeds). Now retired after a career as a Business Analyst and Advisor.
This entry was posted in Regeneration and tagged , . Bookmark the permalink.